Welcome to Silcapor Kosovo. For support contact us: +383 (0) 44 872 791

Silcapor
Dëshmorët e Kombit STR No 55
Matlume, Kaçanik, Kosovo

Block application procedure

Walling with SILCAPOR blocks is quite easy and practical. A very important factor is the surface on which the wall is distinguished. It should be flat. Before starting the walling, prepare the mass of glue or varnish that will be used for walling. Prepare it according to the manufacturer's instructions.

Cutting the block can be done in two ways: mechanical and electric saw, where the method is more preferred for reasons of precision, speed and ease.

The adhesive is placed on the surface of the wall block with different mechanisms, one of the very practical work tools is the small shovel with adequate dimensions on the toothed wall spreader so that the adhesive is distributed on the surface of the block adequately.

The block must be placed on the wall in a precise way, not deviating too much from the surface of the pre-prepared glue.

The wall built of Silcapor blocks must have gaps in the distance from the vertical pillar (column) 1cm, while from the horizontal eye 2cm, such gaps must be filled with filling foam, due to the deletion of the building structure.